WASHKEWICZ HALL 5/20/14 (14-24) Authorized contract with CBLH/Harley Ellis Deveraux for architectural and engineering services, pertaining to the Fenn Hall master plan and renovation project, not to exceed ten percent of the construction cost. 6/25/14 (14-43) University Administration authorized to enter into contract negotiations with Gilbane Building Co. for Construction Manager at Risk pre-construction and construction stage services for Fenn Hall Master Plan and Renovation Project; and to award a contract not to exceed 6.5% of construction cost. 7/10/15 (15-51) Administration authorized to contract with CBLH/HED to increase their architectural and engineering services for the new Engineering Building not to exceed 10% of revised construction cost $31,600,000. 7/10/15 (15-52) Approved increased contract with Gilbane Building Co. to the increased scope of the new engineering building at a cost not to exceed 6.5% of the revised construction cost. 11/20/15 (15-111) Approved total project budget of $45,200,000. Administration authorized to negotiate contract with Gilbane Building Co. Cost not to exceed $38,144,900. 1/29/18 (18-06) Reallocated existing owner contingencies for Gilbane Construction to the engineering building construction budget 6/29/18 (18-66) University Administration authorized to prudently use owner contingency funds in completing Phase 2 of Washkewizc College of Engineering project.